OPERATIONS
LOULO
A very satisfactory performance was achieved by the Loulo operation with record gold production of 70 660 ounces as a result of steady throughput at slightly higher grade and recovery rates. This was despite mining operations being adversely affected during the quarter by prolonged breakdowns experienced by the mining contractor with their Liebherr 994B excavators, resulting in lower than planned mined tonnages.
Total gold sales revenue increased significantly due to higher ounces sold and an improvement in the average gold price received, resulting in higher profit from mining activity. This was due to 42% less ounces being delivered into the hedge during the quarter compared to the previous quarter, as a result of the roll forward of hedged ounces into 2010 and an increase in the spot price received (refer to forward commodity contracts section for more detail). This was partly offset by increased costs resulting from higher diesel prices and the weaker dollar as well as stockpile movements as a result of the lower ore tons mined. Due to the lack of excavator availability, mill feed had to be supplemented with ore taken from stockpiles with a resultant increase in accounting charges.
The carbon in leach expansion project was completed and commissioned during the quarter which should ensure sustained recovery levels. Work on the tailings thickener and clarifier project progressed according to schedule with all the major equipment having arrived on site and it is expected to be complete by year end. Development of the Yalea twin underground declines by Shaft Sinkers reached a vertical depth of 75 metres and 400 metres from the surface by the end of the quarter and it is anticipated that the first ore from the underground mine will be delivered to the plant during the last quarter of this year.
Production statistics are:
| LOULO RESULTS |
Quarter |
Quarter |
Quarter |
6 months |
6 months |
| |
ended |
ended |
ended |
ended |
ended |
| |
30 Jun |
31 Mar |
30 Jun |
30 Jun |
30 Jun |
| |
2007 |
2007 |
2006 |
2007 |
2006 |
| Mining |
|
|
|
|
|
| Tonnes mined (000) |
3 616 |
5 707 |
3 934 |
9 323 |
7 975 |
| Ore tonnes mined (000) |
517 |
657 |
724 |
1 174 |
1 103 |
| Milling |
|
|
|
|
|
| Tonnes processed (000) |
683 |
687 |
630 |
1 370 |
1 352 |
| Head grade milled (g/t) |
3.3 |
3.2 |
2.8 |
3.2 |
2.9 |
| Recovery (%) |
94.6 |
93.8 |
91.9 |
94.2 |
92.4 |
| Ounces produced |
70 660 |
67 908 |
51 233 |
138 568 |
115 910 |
| Average price received (US$/oz) + |
605 |
543 |
577 |
575 |
565 |
| Cash operating costs * (US$/oz) |
304 |
287 |
277 |
296 |
283 |
| Total cash costs * (US$/oz) |
340 |
320 |
313 |
330 |
319 |
| Profit from mining activity (US$000) * |
18 711 |
15 337 |
14 416 |
34 048 |
31 141 |
| Gold sales (US$000) *+ |
42 755 |
37 034 |
30 445 |
79 789 |
68 063 |
Randgold Resources owns 80% of Loulo with the Government of Mali owning 20%. The Government's share is not a free carried interest. Randgold Resources has funded the Government portion of the investment in Loulo by way of shareholder loans and therefore controls 100% of the cash flows from Loulo until the shareholder loans are repaid.
Randgold Resources consolidates 100% of Loulo and shows the minority interest separately.
* Refer to explanation of non-GAAP measures provided.
+ Includes the impact of 19 247 ounces for the quarter (quarter ended 31 March 2007: 33 081 ounces) delivered into the hedge at US433/oz (quarter ended 31 March 2007: US$ 434/oz).
MORILA
Morila produced 86 832 ounces of gold during the quarter at a total cash cost of US$403/ounce. Production was down on the previous quarter due to the advance of the mining faces available not being sufficient to expose the planned higher grade blocks. While the plant throughput was again satisfactory, lower recoveries negatively affected production. The increase in total cash costs and operating cash costs per ounce is mainly due to the lower ounces produced. Unit costs were similar to last quarter with some escalation caused by unfavourable dollar to euro exchange rate fluctuations and higher oil prices.
| MORILA RESULTS |
Quarter |
Quarter |
Quarter |
6 months |
6 months |
| |
ended |
ended |
ended |
ended |
ended |
| |
30 Jun |
31 Mar |
30 Jun |
30 Jun |
30 Jun |
| |
2007 |
2007 |
2006 |
2007 |
2006 |
| Mining |
|
|
|
|
|
| Tonnes mined (000) |
5 379 |
5 015 |
6 006 |
10 394 |
12 065 |
| Ore tonnes mined (000) |
791 |
935 |
1 591 |
1 726 |
3 069 |
| Milling |
|
|
|
|
|
| Tonnes processed (000) |
1 052 |
1 055 |
998 |
2 107 |
2 046 |
| Head grade milled (g/t) |
2.8 |
3.4 |
4.6 |
3.3 |
4.5 |
| Recovery (%) |
91.3 |
92.2 |
92.3 |
91.8 |
92.2 |
| Ounces produced |
86 832 |
103 224 |
135 387 |
190 056 |
271 166 |
| Average price received (US$/oz) |
668 |
652 |
628 |
659 |
594 |
| Cash operating costs * (US$/oz) |
355 |
278 |
187 |
313 |
190 |
| Total cash costs * (US$/oz) |
403 |
322 |
229 |
359 |
230 |
| Profit from mining activity (US$000) * |
23 700 |
31 803 |
51 443 |
55 503 |
94 073 |
| Attributable (40% proportionately consolidated) |
|
|
|
|
|
| Gold sales (US$000) |
23 465 |
26 031 |
32 996 |
49 496 |
62 620 |
| Ounces produced |
34 733 |
41 290 |
54 155 |
76 023 |
108 467 |
| Profit from mining activity (US$000) * |
9 480 |
12 721 |
20 577 |
22 201 |
37 629 |
* Refer to explanation of non-GAAP measures provided.
Mine management is confident that they will meet the planned production scheduled for the second half of the year and is pursuing strategies to recover the production shortfall incurred during the first half of the year.