-->
Tongon Gold Mine Update
LSE: RRS NASDAQ: GOLD

Tongon Gold Mine Update

Tongon Project Update to 31 December 2011...


TONGON RESULTS Quarter Quarter Quarter 12 months 12 months
  ended ended ended ended ended
  31 Dec 30 Sept 31 Dec 31 Dec 31 Dec
  2011 2011 2010 2011 2010
Mining          
Tonnes mined (000) 4 677 2 933 3 143 17 353 7 520
Ore tonnes mined (000) 989 607 415 3 469 898
Milling          
Tonnes processed (000) 606 755 355 2 963 355
Head grade milled (g/t) 2.7 3.2 2.7 2.9 2.7
Recovery (%) 85.1 90.9 92.2 91.2 92.2
Ounces produced 44 332 70 910 28 126 250 390 28 126
Ounces sold 45 864 68 154 4 698 271 922 4 698
Average price received (US$/oz) 1 655 1 730 1 389 1 563 1 389
Cash operating costs* (US$/oz) 730 585 418 510 418
Total cash costs* (US$/oz) 780 637 459 557 459
Gold on hand at period end# (US$000) 2 749 5 570 33 039 2 749 33 039
Gold sales* (US$000) 75 912 117 884 6 527 425 060 6 527
Profit from mining activity* (US$000) 40 154 74 500 4 369 273 686 4 369

 

Randgold owns 89% of Tongon with the State of Côte d’Ivoire and outside shareholders owning 10% and 1% respectively.  Randgold has funded all the investments in Tongon by way of shareholder loans and therefore controls 100% of the cash flows from Tongon until the shareholder loans are repaid. Randgold consolidates 100% of Tongon and shows the non-controlling interest separately.

 

*

Refer to explanation of non-GAAP measures provided. 

  

# Gold on hand represents gold in doré at the mines multiplied by the prevailing spot gold price at the end of the period.